Bay Area Project List

  • Key:
  • plan/permit info
  • performance criteria
  • monitoring report
  • prepared map
  • photo
  • other
  • locate on map
Project Status County Total Acres
Pond 3 Construction completed Alameda 110.2
Pond A4 Construction planned Santa Clara 306.4
Port Sonoma Marina Perimeter Construction completed Sonoma 8.9
Ravenswood Triangle Construction completed San Mateo 3.0
Redwood-San Andreas High School Marsh Construction completed Marin 15.0
Pier 98 Construction completed San Francisco 8.8
Richardson Bay Bridge Marshes Construction completed Marin 6.6
Richmond Parkway Construction completed Contra Costa 3.3
Ringstorm Bay Unit Marsh Restoration Construction in-progress Napa 50.0
Viansa Winery Construction completed Sonoma 94.3
Nordstrom/Shorebird Marsh Construction completed Marin 48.2
Novato Sanitary District Reclamation Project Construction completed Marin 65.0
River Park Construction planned Solano 38.8
San Leandro Shoreline Marshlands Enhancement Project Construction completed Alameda 171.9
Plummer Creek Wetlands Restoration Mitigation Project Construction completed Alameda 26.0
Rush Creek/Cemetery Marsh Enhancement Project Construction completed Marin 272.1
Sanchez Creek Marsh Construction completed San Mateo 3.1
Burlingame Lagoon Construction completed San Mateo 0.3
Pond A18 Construction planned Santa Clara 855.6
San Carlos Airport North Clear Zone Construction completed San Mateo 0.6
Slaughterhouse Point Construction completed Solano 275.5
Bahia Lagoon Construction completed Marin 30.1
Scottsdale Marsh Enhancement Project Construction completed Marin 46.4
Schellville Construction planned Sonoma 386.7
East Shore Park - Schoolhouse Creek Construction planned Alameda 2.3
Seabreeze Marina Construction in-progress Alameda 0.3
Seal Slough Construction completed San Mateo 47.2
Skaggs Island Construction planned Sonoma 4,166.8
Simmons Slough Wildlife Corridor Construction planned Marin 186.2
South Basin Wetlands Construction completed Alameda 3.7
Mare Island Navy Mitigation Marsh Construction planned Solano 62.7
Marta's Marsh Construction completed Marin 20.7
Breuners Mitigation Bank Construction planned Contra Costa 109.1
Color Spot Construction completed Contra Costa 1.5
San Mateo's Master Shoreline Parks Masterplan Construction in-progress San Mateo 13.1
Sonoma Baylands Salt Marsh Restoration Construction completed Sonoma 350.0
South Bay Salt Pond Restoration Project Construction in-progress Alameda, San Mateo, Santa Clara 13,502.7
Western Stege Marsh Restoration Construction in-progress Contra Costa 9.4
Tasman Corridor Light Rail Transit Mitigation Project Construction in-progress Santa Clara 3.6
Marin Flood Control - Seasonal Construction completed Marin 343.4
Edgerley Island Marina Construction completed Napa 9.4
Figueras Tract Construction planned Solano 72.7
Triangle Marsh, Refuge Entry Construction in-progress Alameda 9.4
Tolay Creek Construction completed Sonoma 305.5
Treasure Island Construction planned San Francisco 16.7
Triangle Marsh at Hayward Shoreline Construction completed Alameda 8.7
Stevens Creek Tidal Marsh Construction completed Santa Clara 30.6
Triangle Marsh Restoration Project Construction completed Marin 15.9
East Shore Park - Strawberry Creek Construction planned Alameda 1.7
Nevada Parcel Construction completed Contra Costa 109.0
Sunnyvale Baylands Park Construction completed Santa Clara 12.4
Tubbs Island Marsh Restoration Project Construction completed Sonoma 68.4
Vallejo Mitigation Sites Construction completed Solano 137.4
Bayside Business Park - Phase II Construction completed Alameda 88.0
Bayside Business Park - Phase I Construction completed Alameda 271.0
Whipple Ave Mitigation Construction completed San Mateo 7.7
Warm Springs Pasture Construction planned Alameda 276.0
West End Duck Club Construction completed Napa, Solano 355.2
White Slough Construction completed Solano 94.1
Whales Tail Construction completed Alameda 254.0
Zanker Road Landfill Mitigation Site Construction completed Santa Clara 25.0
Montezuma Wetlands Project Construction in-progress Solano 2,229.0
Hayward Shoreline Enhancement Project Construction completed Alameda 80.3
Foster City Mitigation Sites Construction in-progress San Mateo 29.2
Hoffman Marsh Wetland Mitigation Project Construction completed Contra Costa 6.0
Las Gallinas Ponds Construction planned Marin 68.4
Huichica Creek Unit Construction in-progress Sonoma 51.0
Harvey Marsh Construction completed Santa Clara 52.0
Ideal Marsh Construction completed Alameda 129.4
Emily Renzel Marsh Construction completed Santa Clara 36.0
KGO Towers Construction completed Alameda 1.3
Lake Merritt Restoration Construction planned Alameda 153.3
La Riviere Marsh Construction completed Alameda 117.6
Madera del Presidio Project - Phase I and II Construction completed Marin 100.0
Mare Island Navy Conservation Areas Construction planned Solano 106.3
Mayhew's Landing Construction planned Alameda 110.4
Mare Island Refuge Construction planned Solano 169.9
Marin Flood Control/CDFG - Perennial Construction completed Marin 309.2
Miller Creek Construction completed Marin 12.0
Mill Valley Marsh Construction completed Marin 6.5
MLK Jr. Regional Shoreline Wetlands Project Construction completed Alameda 70.6
Moseley Tract Construction planned San Mateo 61.0
Mountain View Tidal Marsh Construction completed Santa Clara 28.9
Muzzi Marsh Construction completed Marin 147.9
South Napa Wetland Opportunity Area Construction completed Napa 940.1
Napa Sonoma Marsh Restoration Project Construction in-progress Napa, Sonoma 7,322.4
New Chicago Marsh Construction completed Santa Clara 387.0
North Basin Wetlands Construction completed Alameda 5.0
Novato Creek Antenna Field Construction planned Marin 134.2
North Bothin Marsh Enhancement Project Construction completed Marin 0.4
Galbraith Golf Course Wetland Mitigation Project Construction completed Alameda 8.0
Guadalcanal Village Restoration Project Construction completed Solano 55.5
Oakland Middle Harbor Enhancement Project Construction in-progress Alameda 4.9
Hayward Shoreline Enhancement Project-Oliver Salt Ponds Construction planned Alameda 134.0
Oro Loma Marsh Mitigation Project Construction completed Alameda 21.0
Oro Loma Marsh Enhancement Project Construction in-progress Alameda 315.3
Pacific Commons Development Construction completed Alameda 492.0
Pacheco Pond Construction completed Marin 110.9
Palo Alto Harbor Improvements Construction completed Santa Clara 14.3
Perry Gun Club Mitigation Project Construction in-progress Alameda 16.8
Petaluma River Marsh Construction completed Sonoma 45.8
Petaluma Marsh Expansion Project Construction in-progress Marin 108.3
Pier 94 Construction in-progress San Francisco 7.7
Albany Bulb Lagoon Construction planned Alameda 6.7
American Canyon Ecosystem Enhancement Project Construction completed Napa 610.0
Bair Island SFO Mitigation Construction completed San Mateo 220.1
Bair Island Restoration Project Construction in-progress San Mateo 1,385.5
Albany Salt Marsh Expansion Construction planned Alameda 3.6
Central Avenue Marsh - Albany Sequel Construction completed Alameda, Contra Costa <0.1
Pacific Shores Center Construction completed San Mateo 146.2
Northern Outer Bair Island Construction completed San Mateo 551.7
Bel Marin Keys Unit V Construction in-progress Marin 1,564.4
East Shore Park - Berkeley Meadows Construction planned Alameda 55.2
Bothin Marsh Construction completed Marin 0.5
Canalways Construction planned Marin 101.8
Cargill Mitigation Marsh Construction completed Alameda, San Mateo 49.2
Central Avenue Marsh Construction completed Contra Costa 2.9
Coyote Creek Lagoon Construction completed Alameda 8.0
Cerrito Creek at Albany Hills Construction completed Alameda 1.1
Cogswell Marsh Construction completed Alameda 229.1
DUST Marsh Construction completed Alameda 15.0
Charleston Slough Tidal Marsh Restoration Project Construction completed Santa Clara 101.3
Citation Marsh Construction completed Alameda 95.4
Colma Creek Mitigation Construction completed San Francisco, San Mateo 1.6
Cooley Landing Construction completed San Mateo 118.4
Corte Madera Ecological Reserve Expansion Construction completed Marin 8.3
Crissy Field Construction completed San Francisco 13.5
Cullinan Ranch Construction planned Solano, Napa 1,564.1
Hayward Marsh Brackish Construction completed Alameda 60.0
Coyote Creek Flood Control Project Construction completed Santa Clara 66.6
Damon Slough Seasonal Wetland Mitigation Construction completed Alameda 9.8
Deak Marsh Construction completed Marin 0.6
Dunphy Park Construction completed Marin 0.8
Hayward Marsh Fresh Construction completed Alameda 85.9
Eden Ecological Preserve Restoration Project Construction completed Alameda 767.6
East San Rafael Wetlands Construction completed Marin 13.0
Faber Tract Marsh Construction completed San Mateo 87.3
Gallinas Creek Restoration Project - Phase1, 2, and 3 Construction completed Marin 19.5
Emeryville Crescent Construction completed Alameda 50.3
Green Point/Toy Marsh Construction completed Marin 57.4
Hamilton Wetlands Restoration Project Construction in-progress Marin 1,451.2
Belden's Landing Construction completed Solano 15.2
Bayside Business Park - December 2002 Construction in-progress Alameda 17.0
Eden Ecological Preserve Restoration Project - Dixon Landing Road Project Construction in-progress Alameda, Santa Clara 17.5
Leonard Ranch Wetlands Restoration Project Construction completed Sonoma 334.8
Novato Creek Flood Control Project Construction completed Marin 8.0
Lakeside Drive & Mariner's Island Extension Mitigation Construction completed San Mateo 1.9
Triangle Marsh at Larkspur Construction in-progress Marin 1.0
Camp 2 Wingo Unit Marsh Restoration Construction in-progress Napa, Sonoma 608.0
Gianulius Property Construction completed Solano 2.1
I-80 Improvements/HOV Land Project Construction completed Alameda 2.8
Shell Marsh Restoration Project at Peyton Slough Construction in-progress Contra Costa 200.0
Island Slough Wetland Development Project Construction completed Solano 354.0
West Navy Marsh Construction completed Contra Costa 64.4
Hill Slough West Restoration Project Construction planned Solano 223.0
Martinez Regional Shoreline Salt Marsh Enhancement Project Construction completed Contra Costa 11.0
Blacklock Tidal Marsh Restoration Construction completed Solano 70.0
Carquinez Bridge Seismic Retrofit Project Construction in-progress Solano 0.7
Brisbane Baylands Construction in-progress San Francisco, San Mateo 32.0
Route 101/Ralston Ave. Interchange Construction in-progress San Mateo 1.9
Wildcat Creek Marsh Restoration Project Construction completed Contra Costa 279.7
Point Buckler Construction completed Solano 49.5
Ryer Island Construction completed Solano 929.2
Wheeler Island Construction completed Solano 98.0
Chipps Island East Construction completed Solano 270.0
Chipps Island West Construction completed Solano 148.0
CalTrans Mitigation Site Construction completed Solano 21.6
U.S. Maritime Administration Marsh Construction completed Solano 69.6
Madera Bay Park Construction completed Marin 4.9
Huichica Creek Enhancement Construction completed Napa, Sonoma 105.5
Castro Cove Construction in-progress Contra Costa 20.0
Codornices Creek Restoration - Nagai Property Construction planned Alameda <0.1
Sky Ranch Stock Pond Rehabilitation Construction planned Contra Costa 0.3
Refugio Creek Bridge Project Construction planned Contra Costa 0.4
Deer Valley Wetland Restoration Construction planned Santa Clara 2.7
Polhemus Creek Restoration Project Construction planned San Mateo 0.2
McGarvey Gulch Salmonid Barrier Improvements Project Construction planned San Mateo 0.6
Downtown Sewer, Water, and Storm Drain Improvements Construction planned Contra Costa <0.1
12th Street Reconstruction Project Construction planned Alameda 0.7
Reconstruction of Bollinger Road Bridge over Calabazas Creek Construction planned Santa Clara 0.5
Barron Creek at 1018 Los Robles Avenue Construction planned Santa Clara <0.1
Webb Ranch Mitigation Site Construction planned San Mateo 2.7
Bailey Estates Construction planned Contra Costa 5.7
Zone 12 Lines H, J, and K Sediment Removal Project Construction planned Alameda 3.2
Fairfield Corporate Commons Project Construction planned Solano 2.3
Lower Walnut Creek Emergency Interim Protection Construction planned Contra Costa 8.2
Inverness Ridge Construction planned Alameda 0.7
Elsie Gridley Mitigation Bank Construction in-progress Solano 441.2
Adobe Creek Upper Reach 5 Restoration Project Construction planned Santa Clara 0.8
Dan Wilson Creek Bridge Project Construction planned Solano 1.1
Elsie Roemer Enhancement Project Construction planned Alameda 0.6
Kingdom Hall of Jehovah's Witnesses Construction planned Napa 0.2
Castro Valley Creek Daylighting Project Construction planned Alameda 0.8
American Canyon Creek Restoration Construction planned Napa 1.1
Can Duck Club Construction planned Napa <0.1
Carriger Creek Enhancement Construction planned Sonoma 1.0
City of Calistoga Bank Stabilization Construction planned Napa 0.1
Gasser, Vernice/FHK Investment - Gasser Estate Wetland Mitigation Construction planned Napa 1.0
Ghisletta Project Site Construction planned Napa 1.6
John F. Kennedy Park Wetland Enhancement Project Construction planned Napa 17.0
Kennedy Park Master Plan Construction planned Napa <0.1
Napa Air Center Wetland Preserve Construction planned Napa 0.6
Napa Meadows Development Construction planned Napa 9.9
Napa River Bank Stabilization - Carpy-Connolly Ranch Construction completed Napa 0.7
Napa River Oxbow Preserve Construction in-progress Napa 37.3
Napa River, Gasser Wetland Relocation Construction planned Napa 9.5
Napa Urban Waterfront Restoration Construction completed Napa <0.1
Napa Valley Gateway Business Park and Sheehy Creek Realignment and Enhancement Project Construction completed Napa 5.4
Napa Valley Unified School District Site Construction in-progress Napa 314.1
Palmaz Vineyards Creek Restoration Construction planned Napa <0.1
Pioneer Bank Stabilization Project Construction completed Napa <0.1
St. Helena Comprehensive Flood Protection Project Construction in-progress Napa 7.8
Sulphur Creek Restoration Project Construction completed Napa 0.8
First Street Highway 29 Interchange Construction completed Napa 0.2
Upper York Creek Dam Sediment Removal Project Construction planned Napa 2.0
McNabney Marsh/Peyton Slough Dredging and Water Control Structure Project Construction planned Contra Costa 137.0
Loukos Property Stream Bank Repair Project Site Construction planned Contra Costa <0.1
Granada High School Crossing Removal Project Construction planned Alameda <0.1
Southbound Interstate 680 Sunol Grade Modified HOV Lane Widening Project Construction planned Alameda 6.3
Front Street Bank Stabilization Project Construction planned Contra Costa <0.1
Hall Wines - Dry Creek Fish Barrier Removal and Enhancement Project Construction planned Napa 2.0
Roaring River 20-3 Natural Gas Exploration Project Construction planned Solano 1.0
Mills College Lion Creek Stream Channel Stabilization Construction planned Alameda 0.5
Azaya Ranch Vineyard Project - Phase I and II Construction planned Marin 3.7
Preserve at Redwood Shores Mitigation Bank Construction planned San Mateo 90.0
Restoration of Zone 5 Line F-1 Flood Control Channel Construction planned Alameda <0.1
Mare Island Northgate Interchange Project Construction planned Napa 7.7
North Suisun Mitigation Bank/Keswick Village Construction planned Solano 5.8
Zone 2 Line C Flood Control Channel from Line A to East 14th Street Construction planned Alameda <0.1
Zone 6 Line E Bank Failure Repair Upstream of Fremont Boulevard Construction planned Alameda <0.1
California Department of Transportation Caldecott Tunnel Improvement Project Construction planned Alameda, Contra Costa <0.1
California Department of Transportation Conn Creek Slide Repair Project Construction planned Napa <0.1
Union Sanitary District Force Main Access Improvement Project Construction planned Alameda 0.2
San Ramon Creek Realignment at El Capitan Drive Bridge Construction planned Contra Costa 0.4
Zone 4 Line A Improvements Between Cabot Blvd. and UPRR Construction planned Alameda 2.4
Olema RV Resort and Campground Diversion Ditch Restoration Project Construction planned Marin 0.4
Zone 3A Line A Sediment Improvement Project From I-880 to Southern Pacific Railroad Construction planned Alameda 15.5
Rindel Creek Mitigation Project for Reis Avenue Construction planned Solano 0.3
Waterman Water Treatment Plant Expansion Project Construction planned Solano 1.9
Hanna Court Warehouse Project Site Construction planned Napa 8.9
Carlos Place Subdivision Construction planned Contra Costa 0.1
Mission San Jose Water Treatment Plant Access Road Erosion Mitigation Project Construction planned Alameda <0.1
Bernal Avenue Bridge and Road Widening Project Construction planned Alameda 3.5
The Acacia Creek at Union City Development Project Construction planned Alameda 1.0
Arroyo Seco Improvement Program Construction planned Alameda 10.6
Bayfront Park Tidal Wetland Restoration Project Construction planned Marin 0.3
Waldo Point Harbor Construction planned Marin 0.9
Hiddenbrooke - Phase 3 Construction planned Solano 1.0
Lenihan Dam Oultet Modification Project Construction planned Santa Clara <0.1
State Route 87 Detour II Sanitary Sewer Reconstruction Project - Phase II Construction planned Santa Clara <0.1
Dutch Slough Tidal Marsh Restoration Project Construction planned Contra Costa 1,166.0
Yosemite Slough Restoration Project Construction planned San Francisco 12.0
Bahia Wetland Restoration Construction planned Marin 674.3
Southhampton Bay Marsh Enhancement & Interpretive Project Construction planned Solano 210.0
Napa Plant Site Construction in-progress Napa 1,460.0
Sears Point Restoration Project Construction planned Sonoma 2,327.0
India Basin Wetland Creation and Enhancement Project Construction planned San Francisco <0.1
Gateway Tech Center Wetland Mitigation Site Construction planned Alameda 17.6
Skyway Landing Muted Tidal Marsh Mitigation Construction planned San Mateo 1.1
Suisun City Wetland Mitigation Construction planned Solano 1.4
Bayfront Park Wetlands Restoration Project Construction planned Contra Costa 2.0
East Third Avenue Landfill Closure Construction planned San Mateo 4.9
San Leandro Shoreline Restoration Project Construction planned Alameda 8.5
El Corte de Madera Creek Watershed Protection Program Construction planned San Mateo <0.1
Ashford Village Construction planned Solano 1.7
Grizzly Island Road Bridge 23C-184 Construction at Hill Slough Construction planned Solano 1.3
Zone 12 Lines I Maintenance Sediment Removal Project, City of Oakland Construction planned Alameda 0.2
Alhambra Highlands Mitigation Construction planned Contra Costa 1.7
Hillview Estates, Subdivision 8533 Construction planned Contra Costa 1.0
San Mateo Existing Creek Bank Retaining Wall Repair Construction planned San Mateo <0.1
Maintenance Cleaning of Sediment from Culvert, Old Bear Valley Creek Channel, and Silver Hills Creek Drainage Ditches Construction planned Marin <0.1
John Muir Drive Erosion Control Project Construction planned San Francisco <0.1
Sediment Removal Work at Wildcat Creek from Rumrill Bridge to the Restoration Site Construction planned Contra Costa 0.2
Pavon Creeks and Scow Canyon Restoration Project Construction planned Contra Costa 22.0
Elsie Gridley Mitigation Bank/C-17 Assault Landing Zone Construction planned Solano 1.6
Holdener Park Mitigation Project Construction planned Alameda 0.9
Belmont Creek Maintenance Dredging Construction planned San Mateo <0.1
Sulphur Creek Enhancement Project Construction planned Alameda 1.2
Cedar Street Drainage Project Construction planned San Mateo <0.1
Vineyard Creek Channel Enhancement Project Construction planned Marin 1.7
Alhambra Valley Road Bank Repair Construction planned Contra Costa <0.1
Environmental Volunteers EcoCenter Construction planned Santa Clara 0.1
Old Ranch Construction planned Contra Costa 0.5
EBMUD Moraga Road Pipeline Project Construction planned Contra Costa 0.4
North Suisun Mitigation Bank Construction completed Solano 173.6
Elsie Gridley Mitigation Bank/Mission Solano Rescue Mission Construction planned Solano 1.4
Red Top Road Truck Climbing Lane Project Construction in-progress Solano <0.1
Yountville Inn Expansion and Workforce Housing Project Construction in-progress Napa <0.1
Isabel Ave/Interstate 580 Interchange Improvement Project Construction in-progress Alameda <0.1
Elsie Gridley Mitigation Bank/Fairfield-Suisun Sewer District Waste Water Treatment Plant Improvement Project Construction in-progress Solano 4.5
Steelhead Habitat Enhancement Project (SHEP) Construction planned San Mateo, Santa Clara 0.4
Recovery Action Plan for the San Francisco Garter Snake Construction planned San Francisco 0.7
Kirby Hills Natural Gas Storage Facility - Phase II Construction planned Solano 1.0
Wilder Project Construction planned Contra Costa 0.1
Biagi Distribution Center Construction planned Napa 2.4
20 & 40 Hilton Court Slide Repair Construction planned Contra Costa <0.1
Salvador Channel Bank Restoration & Erosion Control Project Construction planned Napa <0.1
Bay Area Rapid Transit District (BART) Warm Springs Extension Construction planned Alameda 17.1
Storm Damage Repair on Route 1 PM 2.6 Construction planned Marin <0.1
Improvements at 353 West Baltimore Avenue in Larkspur Construction planned Marin <0.1
125 Fox Hollow Road Bank Repair - Bear Gulch Creek, Woodside Construction planned San Mateo <0.1
Orinda Oaks Development Construction planned Contra Costa 0.2
Washington Creek Sediment Removal Project Construction planned Sonoma 0.2
Stone Bridge Estates Construction planned Contra Costa <0.1
Jacques Gulch Restoration Project Construction planned Santa Clara 3.1
San Ramon Valley YMCA Construction planned Contra Costa 2.2
Braddock & Logan-Fallon Village Construction planned Alameda 8.5
Vineyard Avenue Project Construction planned Alameda <0.1
Union Sanitary District's Irvington Pump Station Holding Pond Construction planned Alameda 1.3
Elsie Gridley Mitigation Bank/Benicia Bridge Replacement Construction planned Solano <0.1
Elmhurst Creek Sediment Removal and maintenance Project Construction planned Alameda 0.4
Ignacio Creek HOA Culvert Outfall Repairs Construction planned Marin 0.1
Elsie Gridley Mitigation Bank/Meyer Warehouse Project - Phase II Construction planned Solano <0.1
Deepwater Slough Island Construction completed San Mateo 5.8
Interstate 80 High-Occupancy Vehicle Lane Project Construction planned Solano 0.2
Napa Commerce Center Construction planned Napa 4.6
Hopper Creek Diversion Structure Bank Stabilization Construction planned Napa <0.1